17 August 2016

Update on 11 Hallikeld Close

Update on 11 Hallikeld Close

Slow, very slow progress, since my June update.  Basically, it's just been a staircase that meets building regulations and finishing off the mezzanine floor.

But the white food-grade walls were delivered today from Hemsec Panel Technologies, so the new tea-packing room should constructed by Friday.  All we'll then be waiting for is to complete the rooms is a gully drain to be cut out and connected, then a blue resin floor can be laid and plumbing fitted.

The tea packing machine is due for early September.  I am not sure it will get through the doors into the building, but everyone is telling me it'll be fine - let's see what happens then, shall we.

Some photos:

[gallery columns="2" ids="9435,9434,9433,9431"]